Stone retaining wall construction company in Colorado

Ledgestone retaining wall building in Colorado: Get the first course right. Use a torpedo level to level each block front to back and either a 4-foot or 6-foot level to keep each course level and even. Set the blocks with a heavy rubber or plastic mallet. Getting the first course flat and level is extremely important, so take your time. Try to lay the course as close to the center of the trench as possible. Even a small pebble on the surface of a block will throw the one above it out of alignment. And that crooked block will affect the one above it, and so on. That little stone could eventually create an unattractive hump in the top course.

If the block Retaining wall is more substantial as in a metre high or more then the fence would have to be behind the wall instead of through or on top. Most Segmental Retaining Wall blocks do not have a big enough cavity or void for the fence post to be directly concreted inside them and would lack the strength to hold the weight of a fence. Generally, most walls are built using an aggregate (Gravel) backfill or in some circumstances No Fines Concrete (NFC). Because of this, an allowance has to be made for the fence post at the early construction stage such as installing PVC Piping as a sleave for the fence post to fit into, this would require some forethought and good planning.

Colorado Retaining Wall specializes in the building and repair of retaining walls. Whether the wall is for a backyard or driveway of a residence or a commercial Shopping Center, we design and build large block walls for all Earth retention requirements. We have the ability to fortify the wall with shotcrete or soil nails which would include helical tie-backs or micropiles. Nearly every wall we build requires engineering and we have deep relationships with engineers that work hand-in-hand with our foremen regardless of the size of project. Please read our reviews and look and our photo gallery. See more info at Best Retaining Walls Colorado.

After mixing your concrete, pour the wall in horizontal layers of not more than 20 inches, beginning at the ends and moving toward the center. Use a ramp to wheel the concrete into position and a splashboard to direct the pour and control spillage. Remove the spacers as you go, and work the concrete against the sides of the form and around the reinforcement as each layer is poured. Pour layers as soon after the previous one as possible to avoid cold (non-bonded) joints, which cause leaks. Strike off the concrete flush with the top of the form, and then trowel it to the desired finish. Insert anchor bolts for mud sills and wooden caps once the concrete has set sufficiently to hold them. Because of the pressure created by the slope of the lawn, cure the concrete for at least seven days before removing the forms.

After your drainpipe is in place, you should backfill the rest of the space behind the blocks with either sand or pea gravel—either will allow water to filter through to the drainpipe at the base of the wall. For the best results, backfill with a few inches of the material after laying each course of blocks, and use a hand tamper to compact the material. By tamping the backfill every six inches or so, you’ll ensure that it is packed tightly, which will provide additional support from the pressure of the soil behind the wall.